DeniedClaims.net

Free Homeowner Tool

Track Your Dry-Out. Protect Your Wallet.

Log crew visits, equipment on site, and moisture readings every day. When the invoice arrives — you have the documentation to dispute every inflated line item.

0

Days logged

0

Equipment-days tracked

0

Moisture readings

Dry-Out Progresse

No logs yet — start logging today

Pro Tip

Log each visit the same day — ideally before the crew leaves. Takes about 2 minutes. This log is your protection against an inflated invoice.

Crew Visit

Arrival, departure, headcount

Why this matters

The HRLY TECH labor line on your invoice is billed by the hour . Your log is the only independent record of how long the crew was actually on site.

Equipment On Site

Count every unit physically present today

LGR Dehumidifier

Large commercial unit

Air Mover

Axial fan / drying unit

Air Scrubber

Negative air / HEPA

HEPA Filter

Air filtration unit

Thermal Camera

Moisture inspection

Desiccant Dehu.

Commercial unit

Why this matters

The invoice bills each unit per day. Two phantom air movers × $34/day × 12 days = $816 you should not owe. Count what is actually there.

Moisture Readings

Ask the tech for numbers — write them here

Dry Standard = 16% WME

Per IICRC S500, equipment must stop when ALL locations reach ≤16% WME. The date that happens is when billing should stop. Ask the tech for the WME reading at each location on every visit.

Demolition Record

Log only if demo happened today

Why this matters

Demo scope on your invoice must match what was actually removed. Record SF of drywall, LF of baseboard, SF of flooring — before it is gone.
 